King’s College School, Wimbledon - Sports Centre - Official opening today!

The new sports centre is the realisation of two phases of development envisaged in the 2012 Master Plan for developing King’s College School’s facilities. These saw the consolidation of the school’s indoor sports, combining access to both new and existing facilities from a single new sports reception.

 

The new facilities comprise a 6-court sports hall, gym, strength and conditioning suite, studios and a new 6-lane 25m indoor swimming pool to replace the pre-existing outdated facility. The sports hall measures 25.2 x 36m and can be configured to accommodate each of the following activities:

 

-         6 Badminton Courts

-         6 cricket nets

-         2 basketball courts

-         2 five-a side football pitches

-         Hockey

-         Netball

-         Volleyball

-         Exams: 270 desks

-         Assembly: 1100 seats

 

Please use the link below for the 3D scan of King’s College Sports Centre.

 

https://3dmediasolutions.co.uk/3d-model/kings-college-school-sports-centre/fullscreen/